Practical guidance for digital water programs

Start with a clear operational problem, prepare reliable data and agree on how progress will be measured. Explore practical steps for mapping, monitoring, fieldwork and utility operations.

Implementation guidance

Practical starting points for six common challenges

Use these checklists to define the first workflow, the evidence needed and the indicators to review. Each topic connects to the relevant iWater360 capability.

GIS

Build a reliable water asset register

The challenge: Paper maps and inconsistent asset names make infrastructure difficult to locate and maintain.

Start here: Agree on a common asset model before collecting more records.

  • Define asset classes, unique IDs, required attributes and condition fields.
  • Combine existing maps with field verification of priority pipes, valves and meters.
  • Review geometry and completeness before publishing approved records.

What to measure: Track the share of priority assets mapped and verified.

Explore GIS & asset mapping
NRW

Choose where to investigate water losses

The challenge: A utility-wide NRW percentage does not identify the zones or meters that need a field check.

Start here: Build a zone-level evidence base before choosing interventions.

  • Confirm DMA boundaries and align inflow, consumption and reporting periods.
  • Compare flow, pressure, meter coverage and recorded leak locations.
  • Investigate flagged areas and compare indicators before and after action.

What to measure: Use available data to track zone losses and intervention results; anomalies are not proof of leakage.

Explore analytics & NRW
Field data

Design surveys that produce usable records

The challenge: Inconsistent paper forms create missing information and repeat visits.

Start here: Configure one project questionnaire and test it with the field team.

  • Define required fields, choices, asset IDs and GPS accuracy rules.
  • Download forms and maps, then test capture and synchronization without connectivity.
  • Assign supervisors to return incomplete records and publish approved submissions.

What to measure: Track submission completeness, location quality and review status.

Explore offline field collection
IoT

Plan remote monitoring around a decision

The challenge: Installing sensors without a response plan can produce readings that nobody acts on.

Start here: Start with a priority tank, pump or network measurement.

  • Confirm the parameter, device compatibility, site power and communication options.
  • Agree on thresholds, alert ownership and escalation before commissioning.
  • Test readings, device outages and alarm acknowledgement with operators.

What to measure: Track sensor availability, telemetry completeness and alarm response time.

Explore monitoring & IoT
Operations

Connect faults to accountable field work

The challenge: Phone calls and separate task lists obscure responsibility and repeat failures.

Start here: Use a shared asset reference from incident registration through closure.

  • Record the location, severity, affected asset and evidence for each incident.
  • Assign a responsible team, due date and work order with clear completion requirements.
  • Review photos and completion notes, then retain the asset's repair history.

What to measure: Track response time, repair time, overdue work and repeat failures.

Explore maintenance & operations
Implementation

Build a focused pilot before expanding

The challenge: A broad rollout is difficult to assess without a clear baseline and agreed scope.

Start here: Choose one operational challenge and define what a successful pilot must demonstrate.

  • Confirm the site or zone, required modules, source data and accountable users.
  • Prepare data, configure access and train teams on the agreed workflow.
  • Validate maps, forms, alerts and reports, then review adoption before extending coverage.

What to measure: Compare baseline indicators with pilot results and agree on the next deployment phase.

Explore the connected platform
Pilot preparation

Agree on the scope before deployment

A useful pilot connects a defined challenge to a working field-to-report workflow. Confirm what is included, who owns each step and which evidence will support a decision to expand.

  • Inventory existing GIS, asset, billing and telemetry records, including quality gaps.
  • Confirm site access, connectivity, power and compatible devices where monitoring is required.
  • Assign data owners, user roles, reviewers and operational response responsibilities.
  • Agree on deliverables, training, support and any integrations included in the scope.

Define the baseline

Choose the site or zone and record current asset coverage, response time, data completeness or report-preparation time.

Prepare and configure

Clean priority records and configure the asset model, questionnaires, access, alerts and report outputs needed for the use case.

Test with the team

Validate maps, offline synchronization, assignments and connected measurements as applicable. Train the people who will use them.

Review and expand

Compare agreed indicators with the baseline, address adoption or data issues, and select the next assets or workflows to add.

Discuss an implementation plan

Share your challenge, available data and intended outputs so we can define a practical scope with your team.